Debbie Cyr
Purchasing Department
City of Bangor
73 Harlow Street
Bangor, ME 04401
(207) 992-4253
Separate sealed BIDS for [font=font36821]PICKERING SQUARE PARKING GARAGE, RESTORATION PHASE 6[/font] will be received by the Owner at the Purchasing Department, 73 Harlow Street, Bangor, Maine until [font=font36821]2:00 P.M.[/font] local time [font=font36821]July 11, 2018[/font], and then at the said office publicly opened and read aloud.
The BID DOCUMENTS are available by contacting the office of the Engineer:
[font=font36821]Joshua Martin-McNaughton, P.E.
Becker Structural Engineers, Inc.
75 York St.
Portland, Me 04101
[u]jmartinmcnaughton@beckerstructural.com[/u]
207.879.1838 ext. 138
[u]Scope of Work Summary:[/u][/font]
Furnish all labor, materials, equipment and supervision necessary for Restoration Work Phase 6 at Pickering Square Parking Garage. Work includes concrete repair and installation of joint sealant. Minimum bidder qualifications include of five years of documented experience in parking garage and concrete restoration work. Submit qualifications and references with bid.
A [font=font36821][u]Mandatory Pre-Bid Meeting[/u][/font] is scheduled for [font=font36821]Wednesday, June 27, 2018 at 10:00 a.m.[/font] at the parking garage office.
A Performance Bond and Payment Bond, each in the amount of 100% of the value of the work are required.
June 20, 2018
↧