Quantcast
Channel: Bangor Daily News Classifieds: Legals
Viewing all articles
Browse latest Browse all 12250

NOTICE TO CONTRACTORS

$
0
0
Bids are requested for a resurfacing and slope stabilization with drainage improvements projects on Mill Street for the City of Brewer. The project includes different types of road construction including 2" mill with a 1 1/2" overlay, full depth pavement reconstruction to create a superelevated curve, and construction of a widened and paved shoulder and guardrail in the slope stabilization area. See plans for the complete breakdown of construction work. A slope approximately 150' in length will be stabilized with riprap to avoid further erosion. Cross culverts will be replaced as part of this work. New culverts and field basins will be installed in various locations. Interested bidders may obtain bid information and specifications for the project by contacting Brewer Engineering Department at (207) 989-7800. For consideration, the attached bid form must be sealed in an envelope, distinctly marked, "2018 Mill Street Resurfacing and Slope Stabilization Project" and must be received at the Office of Jeremy Caron, Brewer Engineering Dept., 221 Green Point Road, Brewer, ME by 1:00 PM, Thursday March 15, 2018. Any bids received after the date and time specified will not be allowed. A pre-bid meeting will be held at 1:00 pm, Wednesday February 21, 2018 at Brewer Engineering Dept. located at 221 Green Point Road, Brewer, Maine. Prospective contractors should note that this project must be completed before September 30, 2018. As part of the permitting requirements, the work in the stream must be completed between July 15th and September 30th. The City of Brewer, Maine holds the exclusive right to reject or accept all or part of any or all bids received. Feb. 15, 2018

Viewing all articles
Browse latest Browse all 12250

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>